.

Tuesday, February 11, 2014

Assembly Line Balancing

Manufacturing Operations Management 1 Yoke Flange Layout Assignment, array Line Balancing To decide which machines are to be scrapped circumstance maintaining enough capacitance to meet demand a improvement called assembly outline balancing is to be used. Here the ability of each lay is calculated and compared with the required capacity and the capacity of the other postal services to devise a closure that both(prenominal) meets requirements and minimises idle time.          To analyse the current set up a spreadsheet showing the capacity of each identify was produced. To allow for bleak machinery and alimony time an efficiency rate and maintenance margin were deducted. station         weekly time         time allowance for maintenance         Number of machines         efficiency rate         Units per mc/hour         units produced 10         75    Â Â Â Â Â Â 1         4         0.98         13         3771 20 (Ryder)         75         2         4         0.95         6         1664 20(Wickman)         75         2         4         0.98         6         1716 20 (total)                                                      3380 30 (new)         75         1         3         0.98         12         2610 30 (worn)         75         1         3         0.85         12         2264 30 (total)                                                      4874! 40         75         1         2         0.98         29         4206 50 (Detroit)         75         3         1         0.98         60         4233 50 (Cincinnati)         75         1         4         0.6         9         1598 50 (total)                                                      5831 60         75         0.5         2         0.95         19         2689 70         75         0.25         4         0.95         19         5396         The future capacity of the line was predicted at 2 800 units per week. about stations were over capacity, so had the possibility of removing machines. lay 60 was under capacity so duplicate hours of extra time would flip to be added.         Machines were then removed so each station would meet capacity with the minimum get along of machines. Also an overtime allowance was added for station 60. To avoid problems with station 60 not producing enough work for station 70 the capacity of station 70 was reduced in line with station 60 and given the same overtime hours. In... If you deprivation to get a full essay, order it on our website: OrderCustomPaper.com

If you want to get a full essay, visit our page: write my paper

No comments:

Post a Comment